Ashton-under-Lyne — 3-Bed Terrace Converted to a 6-Bed, 3-Bathroom HMO
A full HMO conversion of a traditional 3-bed terrace in Ashton-under-Lyne for a social housing provider, delivering six practical bedrooms and three bathrooms to meet local demand. We handled everything end-to-end — first and second fix electrics, plumbing, joinery, plastering, full decoration, kitchen fit and flooring — coordinating trades so the build stayed tidy, sequenced and, well, sensible.
Objectives
Commissioned by a developer for social housing, this project reworked a 3-bed terraced house in Ashton-under-Lyne into a robust six-bedroom, three-bathroom HMO. The brief focused on creating comfortable lettable rooms with hard-wearing finishes; integrating three bathrooms to serve the occupancy; delivering full HMO compliance with the right fire-safety measures (FD30 doors and an interlinked alarm); and finishing to a low-maintenance standard that stands up to daily use. The outcome landed exactly as intended — and the client? “Very happy.”
Clear sequencing, clean finishes, and compliance signed off without fuss. R Joinery kept the site orderly and communication straightforward. Handed over ready to let.
— Project Manager, Social Housing Developer, Ashton-under-Lyne
Gallery





What We Delivered
- Space planning & partitions
Stud walls to form additional rooms and bathroom layouts, detailed with fire and acoustic considerations where required. - First & second fix carpentry
Structural tweaks, new linings and casings, precise set-out ready for finishing. - Fire safety upgrades
FD30 fire doors with compliant ironmongery and seals; a mains-interlinked fire alarm in line with HMO standards. - Kitchen installation
Durable, easy-to-clean kitchen designed for multi-occupancy circulation and storage.
- Joinery finishing
New skirtings and architraves, door sets hung and eased, with snags resolved before handover. - MEP & finishes
Full first/second fix electrics and plumbing, complete plastering, and decoration to a clean, operational standard. - Flooring
Hard-wearing finishes specified for high-traffic use.
Compliance & Safety
- FD30 fire door package to escape routes and risk areas.
- Mains-interlinked fire alarm installed and tested for the HMO layout.
- Works delivered in line with HMO standards and best practice for social housing schemes.
Joinery Highlights
- Careful partitioning to maximise usable bedroom sizes without the rooms feeling compromised.
- Consistent finishing details (skirtings, architraves, door sets) to lift presentation.
- A robust kitchen fit designed for frequent, everyday use.
Result
A practical, fully compliant 6-bed / 3-bath HMO ready for immediate occupation. The developer noted the tidy coordination across trades and the lack of drama — which, perhaps, is the highest compliment.